A comprehensive engineering and consumer guide to India's national residential rooftop solar scheme. Learn how to claim up to ₹78,000 central subsidy, explore applicable Uttar Pradesh state top-up incentives, verify DCR module compliance, and navigate the National Portal application process from site survey to direct benefit transfer (DBT).

Verified MNRE & UPNEDA Guidelines
Direct Benefit Transfer (DBT) to Bank
DISCOM Net-Metering Interconnection
Independent Technical Resource
National Initiative

What is PM Surya Ghar: Muft Bijli Yojana?

Launched by the Government of India with a total outlay of ₹75,021 Crore, the scheme aims to solarize 1 Crore households across India, providing up to 300 units of free electricity every month while enabling residential consumers to earn income by exporting surplus power back to the DISCOM grid.

₹78,000
Max Central Subsidy
Fixed direct subsidy for 3 kW and higher residential rooftop setups.
₹30,000
UP State Assistance
Additional state top-up subsidy provided through UPNEDA for UP residents.
300 Units
Free Monthly Solar Offset
Designed to offset typical residential electricity usage with a 3 kW system.
1 Crore
Target Households
Pan-India clean energy rollout targeting residential rooftops nationwide.

How the Scheme Operates in Practice

Under PM Surya Ghar, eligible residential electricity consumers install a grid-connected rooftop solar photovoltaic (PV) system. The power generated by the solar panels directly supplies household appliances during daylight hours. Any surplus electricity generated beyond instantaneous domestic consumption is automatically fed into the local distribution company's (DISCOM) grid via a bidirectional net meter.

At the end of each billing cycle, your DISCOM adjusts imported electricity against exported solar units, drastically reducing or virtually eliminating energy consumption charges. Consumers only pay the mandatory fixed meter charges, electricity duty, or the net energy balance where applicable.

Financial Assistance Structure

Central & Uttar Pradesh Subsidy Slabs

Financial assistance is calculated strictly based on benchmark system capacity. The central subsidy is deposited directly into the consumer's bank account via Direct Benefit Transfer (DBT) post-commissioning.

System Capacity Usable Rooftop Area Avg Generation / Month Central Subsidy (MNRE) UP State Top-Up (UPNEDA) Total Potential Financial Support
1 kW (1,000 W) ~100 – 120 sq. ft. 120 – 135 units ₹30,000 ₹15,000 ₹45,000
2 kW (2,000 W) ~200 – 240 sq. ft. 240 – 270 units ₹60,000 ₹30,000 ₹90,000
3 kW (3,000 W) ~300 – 360 sq. ft. 360 – 400 units ₹78,000 (Capped) ₹30,000 (Capped) ₹1,08,000 (Maximum)
4 kW to 10 kW+ ~400 – 1,000+ sq. ft. 480 – 1,300+ units ₹78,000 (Fixed Max) ₹30,000 (Fixed Max) ₹1,08,000 (Maximum)
RWA / GHS (Common Facilities) Subject to terrace size Common utility offset ₹18,000 per kW (up to 500 kW capacity including EV charging & water pumps) ₹18,000 / kW
Mandatory Subsidy Rules: (1) Subsidies apply only to residential individual households and registered Group Housing Societies (GHS/RWA); commercial and industrial properties are not eligible for PM Surya Ghar subsidies. (2) To qualify, solar photovoltaic modules must be fabricated using indigenous solar cells and wafers complying with Domestic Content Requirement (DCR) and ALMM List-I certification. (3) Central assistance is capped at ₹78,000 for residential setups of 3 kW or higher. Uttar Pradesh state assistance is capped at ₹30,000 per connection as per current UPNEDA regulations.
Not sure what capacity your home needs? Use our interactive solar savings calculator to model generation based on your monthly electricity bill.
Launch Solar Calculator →
Verification Checklist

Eligibility Criteria & Essential Documents

Review the pre-requisite conditions set by the Ministry of New and Renewable Energy (MNRE) and local DISCOMs before initiating your application on the National Portal.

Who is Eligible to Apply?

  • Residential Property Ownership: The applicant must be an Indian citizen who owns or holds legitimate occupancy rights to a residential house with a suitable shadow-free rooftop or ground space.
  • Active Domestic Electricity Connection: The house must possess a valid, active residential electricity connection (domestic tariff category) in the applicant's name with an unencumbered billing record.
  • Sanctioned Load Alignment: Proposed solar capacity must align with the DISCOM-sanctioned electrical load (e.g., in Uttar Pradesh under PVVNL/NPCL, solar capacity typically cannot exceed 100% of sanctioned load without a formal load enhancement).
  • No Prior Central Subsidy: No prior central solar rooftop financial assistance should have been availed for the same electricity consumer meter connection.
  • DCR-Certified Hardware Requirement: Installation must utilize DCR (Domestic Content Requirement) solar modules and BIS-certified inverters executed through an empaneled vendor.

Required Documents Checklist

  • Latest Electricity Bill (Mandatory): A clear digital copy of the most recent power bill displaying Consumer Account Number (CA number), tariff category, sanctioned load, and applicant address.
  • Identity & Address Proof: Applicant's Aadhaar Card (with mobile number linked for OTP authentication), Voter ID, or Passport.
  • Bank Account Passbook / Canceled Cheque: Proof of bank account in applicant's name showing visible Account Number, IFSC code, and branch name for direct subsidy DBT transfer.
  • Rooftop Space Proof / Photograph: Clear photograph of the rooftop showing shadow-free orientation (property tax receipt or house registry page may be requested by DISCOM if ownership is under dispute).
  • Vendor Agreement: Standard model agreement signed between the homeowner and the chosen empaneled vendor on the national portal.
Standard Workflow

5-Step National Portal Application Journey

Follow the structured official procedure outlined on the PM Surya Ghar National Portal to ensure seamless technical feasibility approval, safe installation, net meter energization, and direct subsidy transfer.

01

National Portal Registration

Applicant Action

Visit the official National Portal (pmsuryaghar.gov.in). Select your State (e.g., Uttar Pradesh), select your Electricity Distribution Company (DISCOM — e.g., PVVNL, NPCL, DVVNL, MVVNL), enter your Electricity Consumer Account Number, and verify via Aadhaar OTP and registered mobile number.

Portal Registration DISCOM Verification Aadhaar OTP
02

Apply for Rooftop Solar & Feasibility Approval

DISCOM Evaluation

Submit your formal Rooftop Solar application detailing proposed capacity (e.g., 3 kW). The DISCOM technical team reviews local distribution transformer capacity and solar interconnection guidelines. Once approved, the portal status updates to “Feasibility Approved”.

Transformer Load Check Technical Feasibility Online Clearance
03

Vendor Empanelment & Physical Installation

Vendor & Homeowner

Select an empaneled vendor registered with your DISCOM on the national portal. Execute the standard bilateral contract. The vendor installs DCR-certified solar PV panels, grid-tied inverter, IP65 ACDB/DCDB protection boxes with dual SPDs, earthing pits, and corrosion-resistant structural rails.

DCR Modules BIS Inverter Class-II SPD ACDB/DCDB
04

Net-Metering Application & Joint Inspection

DISCOM & Vendor

Upon physical installation, the vendor submits the work completion report and net-metering request on the portal. DISCOM engineers conduct an on-site physical inspection to verify earthing safety, anti-islanding inverter protection, and install the bidirectional net meter.

Net Meter Installation Anti-Islanding Test DISCOM Sign-Off
05

Commissioning Certificate & Direct DBT Transfer

Govt DBT Release

Following net meter energization, the DISCOM generates the official Commissioning Certificate directly on the National Portal. You submit your bank details and upload a copy of your canceled cheque. The central subsidy (up to ₹78,000) is credited directly via Direct Benefit Transfer (DBT) into your bank account within 30 days. UP state top-up subsidy (up to ₹30,000) is processed through UPNEDA.

Commissioning Certificate DBT Direct Transfer Zero Intermediaries
Direct Authorized Access

Official Government Portals

To ensure consumer protection, avoid third-party scams. Always submit your applications and track status directly on authorized government websites.

Central Government Portal

National Portal for PM Surya Ghar

The primary single-window gateway operated by the Ministry of New & Renewable Energy (MNRE) for consumer registration, vendor selection, net-metering applications, and DBT central subsidy release.

Visit pmsuryaghar.gov.in
State Nodal Agency (UP)

UPNEDA Solar Rooftop Portal

Uttar Pradesh New and Renewable Energy Development Agency portal managing Uttar Pradesh state top-up subsidies, state solar policies, and local DISCOM coordination.

Visit solarrooftop.up.gov.in
Union Ministry Portal

MNRE Official Website

Ministry of New and Renewable Energy official portal publishing benchmark cost norms, ALMM List-I certified manufacturer registers, DCR technical circulars, and national guidelines.

Visit mnre.gov.in
Hardware Integrity & Engineering

Certified BOS Hardware for Solar EPC Installers

AGRIM Solar (Agrim TechTrades Pvt. Ltd.) operates as an engineering manufacturer and authorized North Indian B2B distributor of certified solar Balance of Systems (BOS) components. Located in Sector 83, Noida, our facility manufactures custom IP65 ACDB/DCDB protection panels, distributes Deye grid-tied & hybrid inverters, and supplies 1500V UV-stabilized DC cables and HDG aluminum mounting structures.

While consumers register directly with local DISCOM-empaneled contractors on the National Portal, AGRIM Solar partners with certified EPC installers across Uttar Pradesh and Delhi-NCR to provide authentic, laboratory-tested, DCR-compatible balance-of-system hardware built to last 25+ years.

IP65 Dual-SPD Protection Custom ACDB/DCDB enclosures equipped with Class-II SPDs and genuine DC disconnects.
Grid-Tied Inverter Compatibility Single-phase & three-phase inverters featuring certified anti-islanding and 98%+ MPPT efficiency.
Noida Logistics & Fast Dispatch 24-hour turnaround on bulk BOS hardware for EPC contractors executing PM Surya Ghar projects.
Clear Answers

Frequently Asked Questions

Get transparent, documented answers to the most common questions homeowners ask about PM Surya Ghar subsidies, net metering, and installation requirements.

For a 3 kW residential rooftop solar installation in Uttar Pradesh, you can receive a combined subsidy of up to ₹1,08,000. This consists of ₹78,000 central government financial assistance under PM Surya Ghar and up to ₹30,000 state top-up subsidy provided by the Government of Uttar Pradesh through UPNEDA. Both subsidies are credited directly into your Aadhaar-linked bank account via Direct Benefit Transfer (DBT) post-commissioning.
DCR stands for Domestic Content Requirement. Under MNRE guidelines, to qualify for central government subsidies under PM Surya Ghar, the solar PV modules must be manufactured in India using indigenously produced solar cells and silicon wafers (listed under ALMM List-I). Non-DCR panels (which use imported solar cells) may be cheaper in initial procurement but are strictly ineligible for government subsidy under this scheme.
A 3 kW solar system typically produces between 360 to 400 units of electricity per month in North India, which generally offsets the full energy consumption of an average 3-bedroom household with lights, fans, refrigerator, washing machine, and one 1.5-ton inverter AC. However, your monthly electricity bill will not be strictly ₹0 because DISCOMs charge mandatory monthly fixed meter charges (typically ₹110 to ₹165 per kW in UP) and statutory electricity duty. Your variable energy consumption units, however, can be offset to zero.
Once the physical installation is complete, the DISCOM installs the bidirectional net meter and generates the formal Commissioning Certificate on the National Portal. After you confirm your bank account details and upload a canceled cheque, the central subsidy is typically credited via DBT within 30 working days directly into your bank account without any intermediaries.
Yes, however, the registration on the National Portal must be created in the exact name that appears on the electricity bill, and the bank account submitted for DBT subsidy transfer must also belong to the electricity consumer named on the bill. If the meter is in a deceased person's name, you must first apply for a name transfer (mutation) with your local DISCOM before applying on the solar portal.
Standard grid-tied solar systems (on-grid) automatically shut down within milliseconds during a grid power outage. This is a mandatory safety mechanism called “anti-islanding protection” designed to prevent electrocution of DISCOM linemen repairing distribution wires. If you experience frequent power cuts and require backup power, you can install a hybrid inverter connected to lithium or tubular solar batteries, which provides seamless uninterrupted power backup while remaining synchronized with the grid.
Modern high-efficiency Mono-PERC solar panels (such as 550Wp modules) require approximately 90 to 100 square feet per kilowatt. Therefore, a 3 kW system requires roughly 280 to 320 square feet of clear, unshaded rooftop space (whether on an RCC terrace, elevated mounting structure, or tin shed).
Under PM Surya Ghar national standards: Tier-1 Mono-PERC solar modules come with a 10 to 12-year product workmanship warranty and a 25-year linear power performance warranty (guaranteeing at least 80% to 84% generation in year 25). Grid-tied inverters carry a 5 to 10-year manufacturer replacement warranty. Hot-dip galvanized (HDG) or anodized aluminum mounting structures are engineered to resist wind speeds up to 150 km/h with a 25-year design lifespan.

Make Your Rooftop Solar-Ready Today

Speak with AGRIM Solar's technical team in Sector 83, Noida. We provide engineering shadow analysis, custom balance-of-systems sizing, and supply Tier-1 components to EPC contractors across North India.